MISO: Reliability Risk Upped by 49 GW in Approved but Unbuilt Generation
- secureenergyfuture
- Sep 20, 2023
- 1 min read

Per America's Power: MISO CEO John Bear told his Board that MISO needs a “heightened since of urgency” because a wave of generation retirements and diminished reserves in PJM and SPP means that MISO can no longer depend upon imported power from those regions.
Comments